Chronology of CONCEPT Technology Development

 
1978  Introduction of the Multi-Effect-Water-Distillation-System on the German market
 
1978 DTS-Heat exchanger
 
1978 Fully automatic self-sterilisation
 
1980 Usage of TC at valves and heat exchangers
 
1980 First FDA-acceptance of a Concept-Distillation plant
 
1981  Pharma-conform degasifyer
 
1982 PLC - control and documentation
 
1982 Orbital welding
 
1985 Process visualisation on PC (DOS, Windows, OS 2)
 
1992 Fully automatic CIP/SIP systems
 
1992 Fully automatic use points for hot/cold water
 
1993 Fully automatic use points for hot/cold water with automatic sub-loop control
 
1994 Fully automatic mixing and filtration station
 
1994 Fully automatic mixing station with fully automatic CIP/SIP system
 
1994 Telemaintenance of the control via modem
 
1998 Own fabrication of water treatment plants: AquaInject and VapoPure
2000 Planning and installation of stem cell laboratories